No, the only time UPS should be switched off is when the load on the UPS has been removed. This can be done in the following conditions:
- The load has been transferred to another source
- In a parallel redundant system, when the redundant unit can accept full load
- The load is switched off entirely.
Therefore it is essential to maintain and test the UPS and batteries during scheduled times that is convenient to all parties.